Skelmersdale Battery Energy Storage System

Securing the Skelmersdale Battery Energy Storage System

G2 Energy | Skelmersdale

Skelmersdale Battery Energy Storage System, Skelmersdale — project photo 1

01 / Overview

Project Overview

Strike Fencing Contractors provided specialist installation services for the Skelmersdale Battery Energy Storage System. Working on the scheme, the team focused on site security and noise mitigation for surrounding infrastructure. The project involved the installation of high-specification acoustic barriers to address environmental concerns near residential and commercial neighbours. Operating within a high-risk environment, the project required precise coordination and adherence to strict safety protocols. This case study highlights our capability in delivering robust perimeter solutions for critical energy infrastructure projects across the North West.

02 / Scope

Project Details & Scope of Works

The project comprised the installation of 378 linear metres of 3m high Jacksons acoustic fencing. The scope included the provision of two sets of double-leaf vehicle access gates. The specified barrier is the Jakoustic® reflective acoustic system, which is certified to BS EN 1793-2:1998 Category B3. This system offers a laboratory sound reduction of 28 dB and a superficial mass of 25kg/m². These measures were implemented to secure the site perimeter and mitigate noise pollution for nearby properties.

03 / Design

Design Input & Specialist Procurement

Strike Fencing Contractors assisted the project team with product selection and the sourcing of materials to ensure the acoustic barrier met the necessary performance criteria.

04 / Specification

Technical Specifications

  • 3m high Jacksons Reflective Acoustic Fencing - Jakoustic® barrier certified laboratory results: Rating according to BS EN 1793-2:1998 Category = B3 Laboratory sound reduction 28 dB Superficial mass 25kg/m²

05 / Delivery

Installation Challenges & Solutions

The installation was conducted during winter, requiring teams to manage severe weather conditions and extremely muddy ground. Site access was further complicated by the presence of large-scale Tesla battery units that were already live. The proximity to main power lines and the live nature of the battery storage facility presented significant operational risks that required careful management throughout the installation process.

The team maintained a professional approach to manage site risks and logistical constraints, ensuring the installation remained on schedule despite the challenging environmental conditions.

06 / Outcome

Completed Works & Project Outcomes

The installation was completed successfully in the final weeks before the Skelmersdale facility became fully live.

Gallery

Project Photography

Related Projects

Wide view of Leese Park play area in Hartford showing green bowtop railings and contrasting yellow pedestrian gate

Specialist Installations / Railings

Leese Park Play Area

Hartford, Northwich

Strike Fencing Contractors delivered a secure perimeter installation for a playground project in Hartford, Northwich on behalf of Hartford Parish Council.

View Project
M&S Foodhall, Cannock, Cannock — project photo 1

Security Fencing / Architectural Screening / Specialist Installations

M&S Foodhall, Cannock

Cannock

The new M&S Foodhall in Cannock needed several kinds of fencing and protection. The site perimeter, the delivery area and the car park each had different requirements, and the customer-facing areas needed to look good.

View Project
British Steel, South Works, Darlington — project photo 1

Security Fencing / Gates

British Steel, South Works

Darlington

Strike Fencing Contractors installed steel palisade fencing and gates at British Steel, South Works, delivering a secure perimeter solution for the facility.

View Project

Cheshire | Manchester | North West

Planning a similar project?

From an early discussion about product selection to a defined tender package, we'd be pleased to consider your requirements.

Discuss a project